Insulated garden studio completed at Chandlers Ford, Hampshire.






















Outer wall size 11’ deep by 15’ wide
Features 44mm NOTCH JOINT INTERLOCKING LOG SYSTEM. High-grade 44mm interlocking planned and finished logs made from the best quality Scandinavian redwood available. Features a specially designed 4-way chamfered notch-joint system ensuring a tight fit to all boards with no room for damp or wind penetration. All UK designed, machined and manufactured.

Ridge height 2.5 mtrs
Front elevation has an attractive overhang canopy.
Double doors, and three joiner made windows. Full pane style windows. All double glazed, opening, draft sealed and lockable.
CRAFTED INT’ WINDOW FRAMES (painted cuprinol pale jasmine white) & DOOR ARCHITRAVE, SKIRTING, VAULTED BEAM CEILING.  
Premium shingle tile roofing system
Outside was painted with 2 coats of cuprinol shades ‘coastal mist’. The inside plastered and insulated walls and ceiling were painted with 2 coats of quality ivory emulsion.
All built and supported on the fully installed flat, level and firm concrete base
The insulated and strengthened floor is finished with high quality luxury woods vinyl cushion flooring. Full electrics installed including 6 no. double sockets, light switches, low voltage spots led lights, sensor lighting, consumer box, cctv, heating, vent and connection to mains.


Also installed was a front decked area measuring 15’ x 3’ deep. 

Testimonial received from customer...

Our large garden room has just been completed by a very efficient and cooperative team led by Jon. The new build was ready to be installed but we hadn’t had the time to clear a large-enough space for the construction. Despite this, Jon organised one of his team to remove the old shed and this was done with the minimum of fuss. I had also wanted to keep a fairly large tree in the hope that the garden room could be built to accommodate it. However, when the base was being laid it became apparent that this just wasn’t possible. I was going away for a week but Jon organised the removal of the tree at no extra expense whilst I was away. I returned from holiday to find most of the work on the outside had been completed and I was back in time for final discussions on décor. I wanted some changes to the inside paint colour on the windows and to the light bulbs in the spots – both were willingly changed. Snagging was dealt with efficiently, the floor laid finally, and we have moved 
in. Very importantly great care was taken of the rest of the garden during the build. My husband and I have been very impressed with the way the whole project was managed and delivered and have no hesitation in recommending Jon and his team at Southwicks.


The  Fosters, Chandlers Ford

Followers

Blog Archive